Cavity barrier installation: Cavity barriers, installed with the façade

A cavity barrier closes a hidden space, such as the cavity behind cladding, so that fire and smoke cannot spread through it. We install cavity barriers as part of our façade and recladding packages, in the same sequence as the SFS, boards, insulation and cladding, so the barrier line is built by the team that builds the wall.

Approved installer since 2020
FIRAS
Projects with boards and fire barriers in our scope
22
Project capacity
Up to £50m
Façade with insulation and sheathing boards fixed, the windows still in blue film
Hoe Valley School, Woking: external board with fire barriers on the SFS, before the render and cladding.

Why the façade contractor should fit them

Fire stopping is most easily compromised where one trade hands over to the next. Because we install the SFS, boards, cladding, partitions and ceilings, we can fit cavity barriers and fire stopping in the right sequence as the wall goes up, instead of returning to openings that are already closed.

  • One team, one sequence. Frame, boards, insulation, barriers and cladding go on in order, by our own supervised teams.
  • One package to price. Strip-out, framing, boards, insulation, cavity barriers and new cladding can all sit in one package with us.
  • One answer for the wall. The main contractor deals with one specialist for the external wall rather than separate framing, cladding and barrier trades.
Light steel (SFS) wall framing above sheathing boards at the base
Eltham Community Hospital: SFS and sheathing boards, with fire barriers in our scope.

Where we install cavity barriers

  • Façade cavities and building voids: in the cavities behind rainscreen and brick-slip cladding, and in building voids.
  • New-build façades on SFS: behind brick-slip, rainscreen, fibre cement and render systems. On most of our façade projects the scope reads "cement particle board with fire barriers" or "external board with fire barriers".
  • Recladding: when we reclad an existing building, new sheathing boards, insulation and cavity barriers go in as part of the package, with the new cladding. See cladding remediation and recladding.
Dark brick slips on rails, partly installed, beside orange window reveals
Kent and Medway Medical School: brick-slip cladding going on over our boards.

Cavity barrier or fire stop?

A cavity barrier closes a hidden space, such as the cavity behind cladding, so that fire and smoke cannot spread through it. A fire stop seals the gap where a pipe, cable or duct passes through a fire-resisting wall or floor. We install both as part of our façade, recladding and drylining packages.

Fire stopping and passive fire protection

Projects with fire barriers in our scope

Every project below lists boards with fire barriers in our scope. Open a project for its full scope and photos.

London

ProjectPlaceMain contractorOur scopeYear
St Nicholas School Croydon SFS, cement particle board with fire barriers, acoustic panels, GeBrik cladding, fire stopping, ceilings and partitions 2020
St Dunstan's College Catford, London Willmott Dixon SFS, cement particle board with fire barriers, aluminium rainscreen cladding, GeBrik, aluminium flashings and copings, ceilings and partitions, acoustic panels, fire stopping 2020
Twickenham Stadium Twickenham Willmott Dixon Interiors SFS, cement particle board with fire barriers, Hunter Douglas timber acoustic ceilings, bespoke oak ceiling rafts, GRG ceilings, ceilings and partitions 2019
REEC, Richmond Education and Enterprise Campus Richmond Willmott Dixon SFS, cement particle board with fire barriers, GeBrik cladding, Marley cladding, aluminium flashings and cappings, acoustic panels, ceilings and partitions 2019
Woodmansterne Primary School Croydon SFS, cement particle board with fire barriers, GeBrik cladding, aluminium flashings and cappings, ceilings and partitions, acoustic panels 2019
New Addington Leisure Centre Croydon SFS, cement particle board with fire barriers, GeBrik cladding, ceilings and partitions, acoustic panels, fire stopping 2019
Eltham Cinema Eltham SFS, cement particle board with fire barriers, aluminium flashings and copings, GeBrik cladding, perforated rainscreen cladding, ceilings and partitions 2019
Canterbury Mills Academy Croydon Willmott Dixon SFS, cement particle board with fire barriers, GeBrik cladding, timber cladding, external render, ceilings and partitions, acoustic panels 2019
Oasis Academy Arena South Norwood, Croydon SFS, Siniat external board with fire barriers, BTS rainscreen cladding, external insulated render, acoustic panels, ceilings and partitions 2017
Eltham Community Hospital Eltham SFS, Siniat external board with fire barriers, external render, acoustic panels, ceilings and partitions 2016

Kent

ProjectPlaceMain contractorOur scopeYear
Kennedy Building, University of Kent Canterbury SFS, cement particle board with fire barriers, aluminium flashings, GeBrik panels, ceilings and partitions, fire stopping, acoustic panels 2019
Sevenoaks Grammar School Sevenoaks SFS, cement particle board with fire barriers, external render, aluminium flashings and cappings, Euro cladding, Taylor Maxwell brick slips 2018
Christ Church Academy Dover SFS, cement particle board with fire barriers, external render, ceilings and partitions, acoustic panels 2016
Fairfield Leisure Centre Dartford SFS, cement particle board with fire barriers, ceilings and partitions, acoustic panels, fire stopping 2016
Kent and Medway Medical School Canterbury SFS, cement particle board with fire barriers, GeBrik cladding, Marley cladding, aluminium flashings and cappings, acoustic panels, ceilings and partitions, fire stopping

Surrey

ProjectPlaceMain contractorOur scopeYear
Cobham Free School, Phase 2 Cobham Strip-out of existing walls and ceilings, SFS, cement particle board with fire barriers, aluminium flashings and cappings, GeBrik cladding, external render, ceilings and partitions, acoustic panels, fire stopping 2020
Hoe Valley School Woking SFS, Siniat external board with fire barriers, external render, acoustic panels, ceilings and partitions 2018
Nescot, Phase 3 Epsom SFS, cement particle board with fire barriers, external render, acoustic panels, ceilings and partitions 2015
McCarthy & Stone, Guildford Guildford SFS, cement particle board with fire barriers, Marley cladding

Sussex

ProjectPlaceMain contractorOur scopeYear
Greater Brighton Metropolitan College Brighton SFS, cement particle board with fire barriers, aluminium flashings and cappings, cladding, ceilings and partitions, acoustic panels, fire stopping 2020
Adur Civic Centre Shoreham-by-Sea Willmott Dixon SFS, cement particle board with fire barriers, GeBrik cladding, Trespa cladding 2019
REEF Way Hailsham SFS, cement particle board with fire barriers, aluminium flashings and cappings, aluminium cladding, ceilings and partitions, acoustic panels, fire stopping

Installed by a FIRAS-approved contractor

Express Group has been a FIRAS-approved installer since 2020. FIRAS is third-party certification for installers of passive fire protection, so main contractors can show that fire stopping was installed by a certified contractor.

Accreditations and health and safety

Tenders and estimates

Pricing a façade with cavity barriers?

Send the drawings, the fire strategy and the façade specification. We will price the frame, boards, insulation, cavity barriers and cladding together.

What do you need?

Please enter your name.

Please enter your company.

Please enter a valid email address.

Please enter the project name.

What should we price? (tick all that apply)

Please choose at least one package, or "Not sure yet".

Drawings (needed for an estimate)

    Please attach the drawings for your estimate.

    Please confirm you have read the privacy notice.

    Cavity barrier questions

    Anything else? Call 01708 554777.

    What is a cavity barrier?

    A cavity barrier closes a hidden space, such as the cavity behind cladding, so that fire and smoke cannot spread through it.

    What is the difference between a cavity barrier and a fire stop?

    A cavity barrier closes a hidden cavity; a fire stop seals the gap where a pipe, cable or duct passes through a fire-resisting wall or floor. We install both.

    Who installs the cavity barriers: the façade contractor or the fire stopping contractor?

    On any project the main contractor's package split decides. When the façade is ours, cavity barriers are part of our façade build-up, so the barriers are fitted by the same teams, in the same sequence, as the frame, boards and cladding.

    Do you install cavity barriers when you reclad a building?

    Yes. Sheathing boards, insulation and cavity barriers are part of our recladding package, with the strip-out and the new cladding.